Apologies for the gaps in posting our 'regular' 2mm meetimgs (now up to date).
As can be seen we spent the meeting surveying the track bosrds and made a small repair that had been elusive.
We also took time to practice the train movements, checking the uncoupling points an the operation of the reception and distribution feeds. Following the distribution into the warehouse and exchange sidings, a new train is assembled for collection by a trip locomotive. For most of the operations the yard roads are worked by two locomotives.
This is also an opportunity for exhibiion operators to practice.
The next meeting is on 11 December